Uisce Éireann (Irish Water)
Standard Details
The Standard Details outline requirements and provide technical guidance for developers in the provision of water and/or wastewater infrastructure that is to be installed in developments and that will be connected to the water and/or wastewater networks.
There are two sets of Standard Details available for developers – one for water infrastructure and the other for wastewater infrastructure. Each set of Standard Details is accompanied by a Design Risk Assessment (DRA), which outlines the health and safety responsibilities of developers and their designers/contractors in the provision of water and/or wastewater infrastructure.
The use of Standard Details is mandatory in all Uisce Éireann Connection Agreement Offers issued after 6 June 2016. The Codes of Practice will be mandatory in all Connection Agreements issued from 30th April 2017.
Enquire NowNorthern Ireland Water
Standard Details
The Standard Details outline requirements and provide technical guidance for developers in the provision of water and/or wastewater infrastructure that is to be installed in developments and that will be connected to the water and/or wastewater networks.
Enquire NowAlso available in Pressure Pipelines